Case Studies Viewing archives for "Maintenance Work"
Safety cage straightened

Repair to Ladder and Cage Our team removed the damaged sections and replaced them with new steel. The guys then painted the new sections with a galvanising coating to protect it from corrosion…(Read More)

box tipper

Box Tipper

by

The job The engineers at SWP have totally refurbished a box tipper. The piece of equipment works when the front is loaded with a product by forklift. Then through a hydraulic action the box tips up to load the product onto a conveyor. The box tipper had the bushes and pins refurbished along with all…(Read More)

welding

Strengthening Plates Liam and Chris have been working on site to add strengthening plates to a retaining wall. This involved cutting/bending plates, welding and painting the finished welds…(Read More)

ice roller

Ice Roller

by

The Job The ice roller was brought into SWP for some maintenance work to be carried out. New bearings and oil seals were required, as well as a new stainless steel stub end which was damaged due to the collapsed bearing #TheMachinist got to work by removing the two ends followed by disassembling all the…(Read More)

PageLines